Project HAD – Lean Phase Conveying System for Lime APCR in Wales

Ducting to 3 silos

The enquiry for the lean phase conveying system was to remove the operator involvement in handling hazardous waste from the existing flue gas treatment plant. The existing filter system was split into three bag filters each with a cyclone. Each cyclone and filter have a rotary valve which was discharging into a bulk bag. Rather […]

Read More…

Project FT – Dust Extraction to Wet Cyclone on Brick Manufacturing Plant. World First Brick Cleaning System

Brick manufacturing plant

FDL had been contacted to look at the existing dust extraction system back in 2014 as the dust in air levels were high and some form of remedial action was required. Initially FDL were contracted on a consultancy basis to assess the existing system and provide detailed reports, specifications, designs and drawings to allow Forterra […]

Read More…

Project CPCL – Silo Safety System for Clay Pigeon Manufacturers

Silo safety system

Summary We were contacted by a clay pigeon manufacturing company to quote for a pair of silo safety systems to be installed during a 7 day planned maintenance shutdown. A pair of silos are used to store limestone essential to the manufacture of thousands of clays per day, with production running 24/7. Both silos were […]

Read More…

Project RC – Ducting System Design and Installation with Drop Out Box to allow reuse of Existing Filter

Digital filter system design

The client in Ellesmere Port is involved in creating novel recycled glass products, emphasising the energy savings of using recycled product over creating new. As part of a new trial, the company had used an existing filter but suffered a fire due to carryover of debris in the recycled material. As part of further investments […]

Read More…

Project IB USA – CleanPulse Bag Filter under Positive Pressure with Acid Gas Neutralisation

Boiler-Filter-Control-Panel

Problem An international client required assistance in building two flue gas treatment plants for a cellulosic ethanol production plant. This was a pioneering exercise to turn a new technology into a commercial production plant. Filter Designs are signed up to a non-disclosure agreement so in this case study we focus on our plant supply in […]

Read More…

Project BCI – Bag Filter, Gas Suspension Absorber, Reagent Dosing for a Challenging Carbon Process

Open control systems cabinet

The Problem The client supply carbon products for the metal smelting industry to a wide range of users both in the UK and abroad. Following a serious fire at the site resulting in the destruction of the raw material handling building and the subsequent loss of production for more than 12 months we were contacted […]

Read More…

Project SSE – Activated Carbon Dosing Plant using Silo for Tanker Deliveries

Control panel with HMI

The site generated power from a mixed solid fuel source and an issue with dioxins was identified. As a known best available technology with a proven track record, PAC or powdered activated carbon was chosen to inject into the main flue before the existing bag house filter. The Solution The story of this project began […]

Read More…

Project SF – Retractable Extraction Canopy for Steel Lancing

Large piece of wood inside factory

The company, now in its third century and probably the oldest steel business in the world, remains at the forefront of technology for castings and forgings for heavy engineering across the world. As both individuals and a company, Sheffield Forgemasters has never been more aware of its environmental impact and the ongoing responsibility to reduce […]

Read More…

Project CR – HCl Filter & Negative Air Filter System for Soil Remediation in Czech Replublic

White large filter section being craned into place

Summary This project in the Czech Republic had two aspects as the title indicates. The HCl filter served a negative air system which was created in a building to surround a soil remediation site. The process of clearing this Hazardous Waste site involved various systems (specified by others) to protect the workers. Unfortunately, these systems […]

Read More…

Project OP – Multi-cyclones, plastics separation, plastics presses, lean to buildings and more…

Men installing a filter unit

Summary The series of projects below are for a long-term client in the UK. The varied projects illustrate our scope of ability. The client appreciates our ‘can do’ approach, turnaround time and the value of the solutions we provide. Supply Highlights Separation system designed and supplied operating at 99% efficiency Hydraulic Press Outdoor Shelter Extruder […]

Read More…

Our recent Projects

We were contracted to provide 2 small Ceramic filters suitable for a small volume but with a design maximum temperature of 600°C. In addition the filters will be handling a syngas which cannot be mixed with oxygen so an alternative to compressed air would need to be used for the ‘Cleanpulse’ cleaning of the 25 Ceramic element in each of these CPC78 filters. In addition dosing of small amounts of a re-agent is required so the client also opted for a ‘Cleandose’ 25kg bag skid. Find out more about Project CAD below.

Project EE - CleanNOx SNCR System

Project JP2 - Complete Flue Gas Treatment System for Intumescent Paint Furnaces (Phase 2)